- LAPPD Construction prints (psec, nixoninchina)
- our papers, PhD theses, published papers and internal notes (psec, tallanimal)
- Workshop on Precision Time Structure in On-Axis Neutrino Beams - November 1-2, 2019
- Fermilab-Chicago Timing Planning Meeting - March 17, 2018
- GodParent Review - March 16, 2018 (password protected)
- PSEC5 Workshop: Godparent Review, 18 July 2024
- PSEC4A Workshop: Application Needs and Chip Specs, MIT, Cambridge, MA, 15 December 2015
- Second Workshop on Photocathodes: 300nm-500nm, Univ. of Chicago, Chicago, IL; 29-30 June 2012
- The Factors that Limit Time Resolution in Photodetectors, Workshop, Univ. of Chicago, Chicago, IL; 28-29 April 2011(Agenda)
- WORKSHOP ON ELECTRONICS AND DAQ FOR TIMING DETECTORS IN MEDICAL AND PARTICLE PHYSICS, Clermont-Ferrand, France ; 28-29 January 2010(link broken)
- First Workshop on Photocathodes: 300nm-500nm, Univ. of Chicago, Chicago, IL; 20-21 July 2009
- The Development of Large Area Psec Photo-Devices; Workshop VII, Argonne National Laboratory, Lemont, IL; 26-27 February 2009
- Detector Development for Positron-Emission Tomography; Workshop, Univ. of Chicago, Chicago IL; 28 February 2009
- Photo-Detectors in Water Cherenkov Neutrino Detectors; Workshop, Argonne National Laboratory, Lemont, IL; 20 December 2008 (link broken)
- Workshop on Timing Detectors: Medical And Particle Physics Applications; Institute of Nuclear Physics in Lyon (IPNL), France; 15-16 October, 2008(Fermilab password protected)
- March 08 Workshop; Chicago, IL(link broken)
- Symposium on Radiation Measurements and Applications; Berkeley, CA; 2-5 June, 2008(link broken)
- Workshop on Timing Detectors; Saclay, Orme des Merisiers; 8-9 March, 2007(Fermilab password protected)
- Pico-Sec Simulation Workshop; Chicago, IL, USA; 12 December, 2006
- Picosecond Workshop - FP420; Arlington, TX, USA; 28-29 April, 2006
- Pico-Sec Timing Hardware Workshop; Chicago, IL, USA; 18 November, 2005
PSEC5 Workshops
- InSitu Godparent Review, Dec 12, 2016 (password protected)
- InSitu Godparent Review, March 25-26, 2016 (password protected)
- DOE Review, Dec. 18-19, 2012
- Tile Factory Review, March, 2012
- Godparent Committee Memberships and Review Web Pages
- Paper Committee Memberships and Titles/Authors
- Proposal: The Development of Large-Area Fast Photo-detectors
- DOE/ARRA Year I Milestones
- DOE/ARRA Year II Milestones
- DOE Year 1 Report
- Technical Design Report (TDR) DRAFT: Version 1.03, Oct. 2, 2010
- T979 Fermilab Test Beam Memorandum of Understanding, Feb. 27, 2008